Preventive cleaning of the river-bed of Chira river, Peru

Technical details: Cleaning of the river-bed, 17km in lenght, approx. 3 000 000 cubic meters of earthworks and 20 000 cubics of protection of the river bank by stone formation of “Pilot” channels along riverbed  100 – 150 in width on 2 sections ( from km25 to km 40 and from km 52+900 to km 53+670); Services:Works execution Country: Peru…

Exeeding the existing “Poechos” Dam, Peru

Technical details: Embankments dam with central clay core, 48 +3 m height and 8455 m dam crest length Services: Preparation of the detailed design and technical specification for Tender documents; Country: Peru Client: Gobierno Regional Piura, Proyeto especial Chira Piura Project status: 2017

Exeeding the “Wala” Dam, Jordan

Technical details: Raising of existing combined Dam (central section made of Roller Compacted Concrete and two wing embankments on each side) from a height of 52 m to about 67 m Services: Consultancy; Country: Jordan Client: Ministry of Water and Irrigation – Jordan Valley Authority Project status: 2016

Bouzina Dam, Algeria

Technical details: Roller Compacted Concrete dam (RCC), 76,5 m height Services: Preliminary design and tender documentation; Country: Algeria Client: ANBT(Agence nationale des barages et transferts) Project status: 2013

Ourkiss Dam, Algeria

Technical details: Rockfill dam, 40 m height and 380 m dam crest length Services: Preparation of the detailed design and Construction Supervision; Country: Algeria Client: ANBT(Agence nationale des barages et transferts) Project status: 2012

Highway E-763, Section V: Lajkovac-Ljig and Brančići tunnel

Technical details: Construction works on the road (from km 53+139.91 to km 77+118.23), lenght: 24 km; construction of 4 traffic lanes and 3 stopping lanes, 9 bridges, 6 overbridges, intersection “Ljig”, tunnel “Brančići” comprised of 2 tunnel tubes, each 940 m long, and river flow regulation Services:Construction works Country: Serbia Client: Serbian Ministry of Construction / China…

Rehabilitation and reconstruction of a road section Puerto Bermudes – Ciudad Constitucion, Peru

Technical details: Lenght: 58 km,rehabilitation of the existing and construction of 3 new bridges Services: Upgrading, expansion and asphalt paving of a 58km long road section and rehabilitation of the existing and construction of three new bridges; Country: Peru Client: Provias Nacional del Ministerio de Transporte y Comunicaciones Project status: 2021

Kolubara riverbed relocation and regulation, phase II, including the Peštan tributary and accompanying infrastructural facilities, Serbia

Technical details: Riverbed relocation (2,6 km + 1,8 km), construction of a bridge, water intake, pumping station, 2,9km technical water supply pipeline and 3,4 km access road Services: Relocation and regulation of the Kolibara & Peštan riverbeds, construction of a bridge across two rivers, construction of a water intake, pumping station and technical water supply pipeline, construction…