Vinča waste dump with the energy from waste processing plant

Technical details: The new landfill has been designed according to the scheduling of waste disposal: Old landfill: 11.840.000m3; New landfill: 6.202.000m3 (interim landfill: 722.000m3; unprocessed: 4.010.000m3; landfill for residues after treatment: 1.470.000m3) Services: Design and execution of part of the construction works; Country: Serbia Client: Beo čista energija Ltd Project status: On going

Construction of the Annex to Belgrade Airtraffic Control Centre building together with modern, 75 metres high Belgrade Air Traffic Control Tower, Surčin, Belgrade

Technical details: Anex of the building B+GF+3, New tower B+GF+16, Area: 7.400 m2 Services: Design; Preparation of design documentation and fisibility study; General contractor: execution of structural, finishing and MEP works; internal roads, parking, design supervision of construction works Country: Serbia Client: Serbia and Montenegro Air Traffic Services LLC (SMATSA Project status: On going

Nikola Tesla Airport, Belgrade – Refurbishment and extension of the terminal building with ancillary facilities within the modernization planned by 2025.

Technical details:Terminal building: Refurbishment and extension by 2020:41.200m² Planned extension by 2025: 28.000m² Heating plant  44 MW with three-generation plant Waste waters treatment plant: 855m3/day Solid waste treatment plant Services: Design; Preparation of design documentation and fisibility study; Country: Serbia Client: VINCI AIRPORTS SERBIA Project status: On going

Railway section “Straževica tunel (enter) – Jajinci – Mala Krsna”, on (Belgrade) Rakovica – Railway Hub K1 – Jajinci – Mala Krsna – Velika Plana railway and railway station “Mala Krsna”

Technical details: Reconstruction of 58 km of railway (km 9+896 to km 67+800) and reconstruction of the railway station “Mala Krsna” Services:Execution of construction and electric works; Country: Serbia Client: Infrastrukture železnice Srbije, Beograd a.d. Project status: On going

Modernisation of the oil processing complex in NIS Oil Refinery in Pančevo – Construction of a new deep oil processing plant and delayed Coker Unit, Pančevo, Serbia

Technical details: The Delayed Coker Unit (S-5300, DCU); Coke Transport System (S-5600, CHS) and  appurtenant plants/facilities are envisaged for the DCU 2000 t / day of mixed feed 600 t / day petrol coke Services: Validation of all design; static calculations of concrete and steel structures, development of all designs of auxiliary structures; consulting services; checking…

Water treatment plant in the Heineken factory in Zaječar

Technical details:Open and closed concrete reservoirs, pumping plant, technical rooms, server room and laboratories Services: Execution of works including procurement, material delivery and execution of construction and craft works, hydro-technical, electric power, telecommunication, signal, mechanical and internal traffic works. Country: Serbia Client: Heineken Srbija d.o.o Project status: On going

Reconstruction of Karađorđeve street and Savski kej (promenade) near Karađorđeva street

Technical details:Execution of works on the reconstruction of Karađorđeve street (600 m2) and Savski keja -promenade (10.000 m2) near Karađorđeva street including compleete reconstruction (demolition of existing instalations and construction of new one) of existing tram line Services: Works execution; Country: Serbia Client: City of Belgrade, Secretariat of Utilities and Housing Services Project status: On going

Shopping Mall “Ada Mall”, Belgrade, Serbia

Technical details: Area: 94.000 m², Floors: 3B+GF+4 Services: Urban Project; Design & construction supervision consultancy services; Parts of the Design for Construction; Leasing documentation; Execution of MEP works; Country: Serbia Client: GTC Commercial Developments d.o.o. Beograd Project status: 2019

Highway E-763, Section V: Lajkovac-Ljig and Brančići tunnel

Technical details: Construction works on the road (from km 53+139.91 to km 77+118.23), lenght: 24 km; construction of 4 traffic lanes and 3 stopping lanes, 9 bridges, 6 overbridges, intersection “Ljig”, tunnel “Brančići” comprised of 2 tunnel tubes, each 940 m long, and river flow regulation Services:Construction works Country: Serbia Client: Serbian Ministry of Construction / China…

Kolubara riverbed relocation and regulation, phase II, including the Peštan tributary and accompanying infrastructural facilities, Serbia

Technical details: Riverbed relocation (2,6 km + 1,8 km), construction of a bridge, water intake, pumping station, 2,9km technical water supply pipeline and 3,4 km access road Services: Relocation and regulation of the Kolibara & Peštan riverbeds, construction of a bridge across two rivers, construction of a water intake, pumping station and technical water supply pipeline, construction…

Railway reconstruction on Corridor 10; three sections: Sopot Kosmajski – Kovačevac, Mala Krsna – Velika Plana, Golubinci – Ruma, Serbia

Technical details: Total lenght of all sections: 65,7 km Services: Works execution; Reconstruction of the roadbed, construction of new culverts, station platforms and approach tracks, relocation and protection of cables and structures; Country: Serbia Client: Serbian Railways JSC/RŽD International Project status: 2016

Tunnel Straževica on the Belgrade bypass, construction of the section Dobanovci – Bubanj Potok, Serbia

Technical details: Length of the tunnel: 745 m i 115 m Services: Construction; Construction of right & left tunnel tube,clear opening 110 m2, two pedestrian tunnels, clear opening about 25m2, regulation of the Rakovicki stream within the zone of the tunnel, reconstruction of the 13th October street in the intersection Country: Serbia Client: Public Enterprise “Roads of…

Construction of Mirijevo Boulevard with Appurtenant Infrastructure, Serbia

Technical details: Length of the street: 950 m Services: Construction; Commissioning; Construction of the city street, with appurtenant infrastructure: reinforced-concrete revetment and sewerage (cross-sections: 300×210 cm and 400x18cm),gas & water supply pipeline, sanitary sewerage, storm water drainage & 110kV transmission lines Country: Serbia Client: Belgrade Land Development Public Agency Project status: 2011

Reconstruction of Jurija Gagarina street, in the area located under the railroad tracks at Novi Beograd including the construction of a 188 m long railroad bridge as well as embankment of the railroad, Serbia

Technical details: Length of the bridge: 188 m Services: Construction; Construction of a new railway overbridge (continuous girder made of prestressed concrete, length L = 188 m and of box cross-section) with the construction of the railway road bed and uperstructure; Country: Serbia Client: Belgrade Land Development Public Agency Project status: 2010

Construction of the New Sulfhuric Acid Plant at CMSC Bor, Serbia

Technical details: PS convectors, conveyors, flash furnace gas and pierce smith converters handling, WESP, contact section, convertor, absorbing towers, blower 4MW, preheater, heat exchangers, strong acid building, blower and MCC building. Services: Project Management; construction works, partial delivery of equipment and materilas, complete erection of the mechanical and electrical equipment and installations; Country: Serbia Client: CMSC Bor,…

Coal mine Kolubara – A New Coal Depot, packadge C2, Infrastructure, Serbia

Technical details: Energy Eficiency by Ecological Coal Quality Management; Infrastructural buildings and plants for the new coal depot in RB Kolubara, at surface mining Tamnava – Zapadno polje Services: Equipment and material delivery for the management of coal qulaity, execution of civil, mechanical and electrical works, takeover and start; Package C2: Infrastructure; Country: Serbia Client: PU Electric…

Rehabilitation of Unit B1 and construction of flue gas desulfarization plant for Units B1 and B2 in Thermal Power Plant Kostolac B, Serbia

Technical details: Rehabilitation of 348.5 MW unit, including interventions on: • bolier piping system replacement and replacement of boiler auxiliaries • main piping replacement • ESP reconstruction • 6.3 kV switchger replacement Services: Technical support for Project Management; Country: Serbia Client: EPS (Electric Power Industry of Serbia) and Business Entity TPP and Mines Kostolac ltd Project status: 2017

New energy supply system of Clinical center Nis, Serbia

Technical details: Total capacity 32 MW, 3 hot water boilers, district heating pump station, central steam boilers, CMS (central monitoring system), 8 clinics indoor heating installations, 1.8 km district heating pipeline, 18 substations Services: Design; Project Management; Construction; Works execution; Procuremant; Commissioning; on turn key basis; Country: Serbia Client: Ministry of Health & Clinical Center Nis Project…

New energy supply system of Clinical Center of Serbia in Belgrade – Cogeneration (combined heat and power plant), Serbia

Technical details: Total capacity: 1,8MWe and 1,8MWt; 3 hot water boilers of 40MW, district heating pump station, central steam boilers (6t/h), 2 steam boilers (2×2,5t/h), CMS (central monitoring system) Services: Design; Project Management; Construction; Works execution; Procuremant; Commissioning; and two years maintenance; Country: Serbia Client: Ministry of Health & Clinical Center of Serbia Project status: 2008