Technical details: Construction of road (from km 53+139.91 to km 77+118.23) Lenght: 24 km

Services: Final Design and construction of highway, 4 traffic lanes and 3 stopping lanes, 9 bridges, 6 overbridges, intersection “Ljig”, tunnel “Brančići” comprised of 2 tunnel tubes, each 940 m long, and river flow regulation.

Country: Serbia

Client: Serbian Ministry of Construction /
China Shandong International Economic & Technical Cooperation

Project status: On going