Constantine the Great airport complex, Niš – reconstruction and construction of internal road infrastructure within

Technical details: 65,000m² under roads, car parks and pavement on the new customs terminal and the passenger terminal; new foulwater, stormwater, water supply and fire water networks; a new telecommunication network; a new power supply network with a transformer substation; a facility with changing rooms and toilets; three tollbooths Services:Design development Country: Serbia Client: Airports…

Railway section “Straževica tunel (enter) – Jajinci – Mala Krsna”, on (Belgrade) Rakovica – Railway Hub K1 – Jajinci – Mala Krsna – Velika Plana railway and railway station “Mala Krsna”

Technical details: Reconstruction of 58 km of railway (km 9+896 to km 67+800) and reconstruction of the railway station “Mala Krsna” Services:Execution of construction and electric works; Country: Serbia Client: Infrastrukture železnice Srbije, Beograd a.d. Project status: 2022

Upgrade of the navigational lock on the HPP Djerdap 1

Technical data: Two step Navigation lock dimensions of 34 m x 310 m Services: Preparation of feasibility study and preliminary design /  Preparation of Technical documentation / Supervision Country: Serbia Client: PU EPS (Electric Power Industry of Serbia) / DSD NOELL GmbH / iC consulenten ZTGesmbH, Vienna Project status:2019 / 2021 / 2022

Improving the conditions for the transfer of ships within the Tisa dam

Technical data: The facility consists of concrete and earth part and navigation lock for ships up to 1000 tons. Services: Preparation of Pre-Feasibility Study with General Design, Feasibility Study with Preliminary Design and Environmental Impact Assessment Study Country: Serbia Client: Ministry of Construction, Transport and Infrastructure Project status: ongoing