Forming of green belt for the TPP Nikola Tesla A

Technical data: Total length of green belt is 13.7 km Services: Preparation of pre-feasibility study, general design, investigation works, feasibility study, design for construction permit and design for construction Country: Serbia Client: PU EPS (Electric Power Industry of Serbia) Project status: 2021