Qatar power transmission and distribution system extension – Phase XI, Qatar

Technical details: Consultancy Services for Qatar Power Transmission System Expansion – Phase XI projects covering installation of new: • Substations, • Cables (33.9km of 220kV, 2500sqmm, 515 MVA and 22.4km of 132kV, 2000sqmm) • Telecommunication system, • Substation Contro Services: Consultancy; Country: Qatar Client: KAHRAMAA (Qatar General Electricity and Water Corporation) Project status: On going

Wind Power Plant Čibuk 1 (158 MW)

Technical details: WPP Installed capacity of  158 MW, comprising 57 wind turbines of 2.78 MW each. Wind turbine generators are connected by a wide network of 35kV cables to 35/400kV substation and further to Serbian power transmission system Services: Preparation of all technical documentation Country: Serbia Client: Vetroelekrane Balkana d.o.o. Project status: 2019.

Coal mine Kolubara – A New Coal Depot, packadge C2, Infrastructure, Serbia

Technical details: Energy Eficiency by Ecological Coal Quality Management; Infrastructural buildings and plants for the new coal depot in RB Kolubara, at surface mining Tamnava – Zapadno polje Services: Equipment and material delivery for the management of coal qulaity, execution of civil, mechanical and electrical works, takeover and start; Package C2: Infrastructure; Country: Serbia Client: PU Electric…

Rehabilitation of Unit B1 and construction of flue gas desulfarization plant for Units B1 and B2 in Thermal Power Plant Kostolac B, Serbia

Technical details: Rehabilitation of 348.5 MW unit, including interventions on: • bolier piping system replacement and replacement of boiler auxiliaries • main piping replacement • ESP reconstruction • 6.3 kV switchger replacement Services: Technical support for Project Management; Country: Serbia Client: EPS (Electric Power Industry of Serbia) and Business Entity TPP and Mines Kostolac ltd Project status: 2017

“Facility D” power and water production plant (2.800 MW, 590.000m3/day), Qatar

Technical details: Installed power generation capacity: 2,400 MW; Potable water production: 590.000 m3/day Services: Consultancy; – location selection, Concept Design preparation, Bid Document preparation, selection of preferred bidder and assistance in final contract negotitations with selected IPWP; Country: Qatar Client: KAHRAMAA (Qatar General Electricity and Water Corporation) Project status: 2016

New energy supply system of Clinical center Nis, Serbia

Technical details: Total capacity 32 MW, 3 hot water boilers, district heating pump station, central steam boilers, CMS (central monitoring system), 8 clinics indoor heating installations, 1.8 km district heating pipeline, 18 substations Services: Design; Project Management; Construction; Works execution; Procuremant; Commissioning; on turn key basis; Country: Serbia Client: Ministry of Health & Clinical Center Nis Project…

New energy supply system of Clinical Center of Serbia in Belgrade – Cogeneration (combined heat and power plant), Serbia

Technical details: Total capacity: 1,8MWe and 1,8MWt; 3 hot water boilers of 40MW, district heating pump station, central steam boilers (6t/h), 2 steam boilers (2×2,5t/h), CMS (central monitoring system) Services: Design; Project Management; Construction; Works execution; Procuremant; Commissioning; and two years maintenance; Country: Serbia Client: Ministry of Health & Clinical Center of Serbia Project status: 2008