Technical details: Embankment dam, 90 m high, with the reservoir having the capacity of 108 million m3; Headrace-tailrace tunnel 6,442 m long and having the diameter of 7.4 m/6.8 m/6.0 m; Powerhouse with 4 Francis units, each unit having the rated capacity of 157.1 MW in the turbine mode of operation and each unit having the maximum capacity of 167.9 MW in the pump mode of operation

Services: Preparation of Preliminary Design with Feasibility Study / Analysis and Investment-Technical Documentation

Country: Serbia

Client: PE EPS (Electric Power Industry of Serbia)

Project status: On going / 2021