Technical details: HPP installed capacity 35 MW with the rockfill dam, 75 m height
Services: Preparation of the basic design and feasibility study;
Country: Bosnia and Herzegovina
Client: Mjesoviti Holding Elektroprivreda Republike Srpske Maticno preduzece AD Trebinje
Project status: 2013