Forming of green belt for open cast mine Radljevo

Technical data: Total length of green belt is 10,5 km Services: Preparation of pre-feasibility study, general design, investigation works, feasibility study, design for construction permit and design for construction Country: Serbia Client: PU EPS (Electric Power Industry of Serbia) Project status: 2021

Improving the conditions for the transfer of ships within the Tisa dam

Technical data: The facility consists of concrete and earth part and navigation lock for ships up to 1000 tons. Services: Preparation of Pre-Feasibility Study with General Design, Feasibility Study with Preliminary Design and Environmental Impact Assessment Study Country: Serbia Client: Ministry of Construction, Transport and Infrastructure Project status: ongoing